Friday, March 11, 2011

Life at home decoration guide spring decoration to pay attention to details hardcover moisture loving family - living at home - People in Tianjin window

     News of domestic and international social commentary | high-level government meetings Dynamic Personnel Management News | Life home livable | Food | Health | Entertainment SPA Constellation Museum of Westward popular workplace | Environmental | Broadwood ,vibram five fingers
    Tianjin Binhai New Area of ​​China High-tech Zone District | Real Estate Finance Sankei New Financial Technology Exhibition | Car | Digital | Travel | Education | Cool is still sports goods is still 3G | City do | Military | Video | Special summary content: tiling and timber structures should be strictly isolated, non- in the living room, restaurants and other places foam bricks, and cement should be no corner of the balcony or the restaurant where wood for construction, cut tiles should be in the balcony, kitchen construction.
    material requirements 1. Selection, the selection of low moisture content of the material.
    2. Transporting materials, to as much as possible when the weather is sunny, if it rains really need, protecting the application of plastic film,insanity dvd, do not get wet.
    3. Site using the sheet, use your wooden paving, not directly on the ground, but not on the kitchen, health, balcony and so easy to tidal areas.
    4. Gypsum board can not be directly on the ground.
    5. Wood line should be placed in the wall of the tripod.
    6. If the material has been on the tide, can no longer use,mac makeup, should not dried before use.
    7. White emulsion adhesive material but also with low water content.
    structure processing
    1. The original structure as far as possible the body dry.
    2. Assemble the new wall as little as possible.
    3. Openings or windows to minimize the use of cement plaster.
    construction requirements
    1. Process requirements:
    ① the construction of water do first: If bricklaying, plastering, dry surface structure and then be around to do wood in structural engineering.
    ② tiling and timber structures should be strictly isolated, is strictly prohibited in the living room, restaurant and other local hot brick, and cement should be no corner of the balcony or the restaurant where wood for construction, cut blocks should be on the balcony kitchen construction.
    ③ If the ground leveling works, structural works should do before you begin leveling the ground.
    2. Process requirements:
    ① line shut after not planed before being painted.
    ② veneer should be a primer and then the construction of thick brush, lines have to double-sided painting.
    ③ to choose when to do the first pass in the paint in fine weather.
    ④ paint to play with a dry towel and then wet milling.
    ⑤ The paint was from the second pass, each try to paint thinner again,vibram 5 fingers, try to avoid pinhole mist and volcanic lip.

    [First] [Previous] [Next] [Last Page ] Select Page 12

    No comments:

    Post a Comment